The City of Winnipeg says that the Arlington Bridge is open once again after being closed due to damage on the road.

The WPS said that new road damage was discovered Sunday morning. Cadets had blocked off entry to the bridge in both directions.

The City of Winnipeg said that crews dispatched to the scene discovered that some asphalt on the roadway had become dislodged, requiring repairs.

Crews finished the repairs late Sunday afternoon, and the bridge is open to traffic once again.